chilly and damp....
Nov. 16th, 2024 12:59 pm![[personal profile]](https://www.dreamwidth.org/img/silk/identity/user.png)
At least it's not actually raining -- it's been doing that mostly overnight or when I'm at work this week. I did get rained on a teensy bit yesterday when I was out running extended errands -- hadn't done anything since before the election, so I was way behind, although we hadn't run out of anything. Only three cans of cat food left, though.
Today I need to clear the living room of all the things that I've just been dropping there to deal with "later". It is now later, so....
BC and I did a layout of the new office space (so they know where to put the outlets and the network and phone ports). Once I got the room plotted out, and post-its of the furniture sizes, it took about 5 minutes, and we tried a few different configurations. :) She was impressed. There's a desk in the corner with the person's back to the door, but as that's the second clerk, I don't see it as an issue -- that person will rarely be in the office by themselves. There is space to shift the desk away from the wall, but then that person will be between the wall and the desk. This may be preferable, I don't know.
And then word came down from 'on high' that they wanted a third estimate, and they wanted to ponder some of the results of the energy audit. sigh. It's not going to be plausible to replace two small gas furnaces (new one is 5 yrs old, old one is only 10) with a heat pump, especially if it means redoing the HVAC system in the entire building. [The HVAC in the old building needs to be fixed anyhow, because the person acting as General Contractor (to "save money") for the remodel 5 years ago screwed it up, and exactly how badly has now become clear. It was apparent shortly after the remodel was finished that there were issues, but the "GC" said it was fine. It wasn't, and still isn't, but BC and I went poking around in the basement/ductwork with a flashlight and chalk and figured out what was wrong. Short version? Penny-wise and pound-foolish. (or, as Papa used to say "you'll always remember how much you saved".)]
My TSax compatriot at Livingston will not be playing the Holiday concert -- his wife scheduled a "I gotta get out of this town" vacation for that weekend, so.... It'll be OK, although I will have to pay especial attention to Christmas Festival, which I'm used to playing in a different key. It's important to play a Bflat instead of a B, really it is. And I need to work on the flying-finger bits in Home Alone. (I needed to work on them anyway, because he was very clear that he wasn't gonna try for the 8th notes at 160bpm, much less the 16th notes.) And there's another piece where I'll probably be playing the 2nd ASax part -- both of the AS2 players are new to the instrument, and are scared of the accidentals and syncopations.
Today I need to clear the living room of all the things that I've just been dropping there to deal with "later". It is now later, so....
BC and I did a layout of the new office space (so they know where to put the outlets and the network and phone ports). Once I got the room plotted out, and post-its of the furniture sizes, it took about 5 minutes, and we tried a few different configurations. :) She was impressed. There's a desk in the corner with the person's back to the door, but as that's the second clerk, I don't see it as an issue -- that person will rarely be in the office by themselves. There is space to shift the desk away from the wall, but then that person will be between the wall and the desk. This may be preferable, I don't know.
And then word came down from 'on high' that they wanted a third estimate, and they wanted to ponder some of the results of the energy audit. sigh. It's not going to be plausible to replace two small gas furnaces (new one is 5 yrs old, old one is only 10) with a heat pump, especially if it means redoing the HVAC system in the entire building. [The HVAC in the old building needs to be fixed anyhow, because the person acting as General Contractor (to "save money") for the remodel 5 years ago screwed it up, and exactly how badly has now become clear. It was apparent shortly after the remodel was finished that there were issues, but the "GC" said it was fine. It wasn't, and still isn't, but BC and I went poking around in the basement/ductwork with a flashlight and chalk and figured out what was wrong. Short version? Penny-wise and pound-foolish. (or, as Papa used to say "you'll always remember how much you saved".)]
My TSax compatriot at Livingston will not be playing the Holiday concert -- his wife scheduled a "I gotta get out of this town" vacation for that weekend, so.... It'll be OK, although I will have to pay especial attention to Christmas Festival, which I'm used to playing in a different key. It's important to play a Bflat instead of a B, really it is. And I need to work on the flying-finger bits in Home Alone. (I needed to work on them anyway, because he was very clear that he wasn't gonna try for the 8th notes at 160bpm, much less the 16th notes.) And there's another piece where I'll probably be playing the 2nd ASax part -- both of the AS2 players are new to the instrument, and are scared of the accidentals and syncopations.