Sep. 6th, 2018

jennlk: (sunflower)
DB started classes last week, FCB rehearsal starts next week, and J and I did the bridge walks on Monday.

We also did the Mackinaw City tourist thing this year. We went to all the State Parks in the Mackinac district -- Mill Creek, Mackinac Point Lighthouse, and both forts (Michilimackinac on the mainland and Mackinac on the island) -- and spent a day poking around on Mackinac Island. There's more reconstructed buildings at Michilimackinac than there were the last time the kids and I went, but that was six years ago.

weekend )

Garage construction continues. "my" side of the wall is nearly done - it's a partial panel at the end, so J is leaving it in case he gets a damaged panel of plywood - and the ceiling in the workshop area is about half done. J will soon be trenching in a gas line out to the garage so he can run a gas heater out there - a bit more work now will save a lot of money, as gas heaters are much cheaper to run than electric - and that needs to be done before he can put the walls up in the workshop.

Profile

jennlk: (Default)
jennlk

May 2026

S M T W T F S
     12
345678 9
1011121314 1516
1718192021 2223
24252627282930
31      

Most Popular Tags

Page Summary

Style Credit

Expand Cut Tags

No cut tags
Page generated May. 22nd, 2026 08:33 pm
Powered by Dreamwidth Studios