There was a weekend in there somewhere.
May. 8th, 2017 09:39 amSaturday morning I went out to feed the birds, and noticed that the water level in the pond had dropped by 5-6 inches overnight. This most likely indicates a leak in the rill or in the hose from the pump to the top of the rill. So I unplugged the rill, and filled the pond back up. I then spent about six hours moving rock. 1500 pounds of it, an armload at a time. (I would have preferred to be weeding the gardens, but after nearly 2 inches of rain, they were too wet and mushy to work in.) The water level in the pond has not dropped significantly since I unplugged the rill, so that narrows down the location of the leak. We then wandered off to a home improvement store to see what they had in the way of retaining block and caps. Rebuilding the rill has been on the 'want to do sometime' list for a while, and it just moved much farther up the list.
J found a frog lurk while tearing the flagstones out of the front of the rill - there were three frogs under the top level rock. One of them scampered off while J was getting me, and the other two got relocated into the pond. I found a toad hole (with a toad in it!) when I was moving rocks. I picked up a rock, and the sand underneath blinked at me. Erm. So I left that area alone for a few hours and moved other rocks. Eventually, the toad warmed up enough that he wandered off a little ways (although still in the way), and then J relocated him to under one of the shrubberies by the pond.
Sunday, I left the house at 0930 and didn't return for more than a change of clothes until nearly 1900. I had a concert in Novi, and had to leave for that by 1300 or so, and between church and leaving for the concert I had to take DB some food. DB was in the middle of an 18+ hour day, and due to staffing, he couldn't leave. (it's an easy enough gig - unlock the doors and turn on everything at 6am, turn off everything and lock back up at midnight or so, the rest of the time just be in the booth in case something goes wrong - but he had to be there all day.)
The concert (at St James Catholic Church) went pretty well, I thought. People seemed to like it - I got lots of positive comments as I was working teardown - and it's always nice to play for an appreciative audience. The space is very very "live" so it was hard for us to not be too loud, and the setup was odd, so it was more difficult than usual to hear across the band. We did one piece that was mostly woodwind choir, and I just locked in on Damien and didn't worry about what I could/could not hear -- by the time any sound got back to me it was late anyway.... Teardown and loadout took longer than usual - there was more percussion than we usually haul to summer gigs, and they actually rented a trailer for the stand racks. By the time we got back to Harrison for loadout, we were down to a handful of people. I got to show J how to get Al into his cabinet (Al is the big bass drum that the FCB bought a few years ago, and he lives in a locked cabinet where he can't be damaged by careless high school drummers).
J found a frog lurk while tearing the flagstones out of the front of the rill - there were three frogs under the top level rock. One of them scampered off while J was getting me, and the other two got relocated into the pond. I found a toad hole (with a toad in it!) when I was moving rocks. I picked up a rock, and the sand underneath blinked at me. Erm. So I left that area alone for a few hours and moved other rocks. Eventually, the toad warmed up enough that he wandered off a little ways (although still in the way), and then J relocated him to under one of the shrubberies by the pond.
Sunday, I left the house at 0930 and didn't return for more than a change of clothes until nearly 1900. I had a concert in Novi, and had to leave for that by 1300 or so, and between church and leaving for the concert I had to take DB some food. DB was in the middle of an 18+ hour day, and due to staffing, he couldn't leave. (it's an easy enough gig - unlock the doors and turn on everything at 6am, turn off everything and lock back up at midnight or so, the rest of the time just be in the booth in case something goes wrong - but he had to be there all day.)
The concert (at St James Catholic Church) went pretty well, I thought. People seemed to like it - I got lots of positive comments as I was working teardown - and it's always nice to play for an appreciative audience. The space is very very "live" so it was hard for us to not be too loud, and the setup was odd, so it was more difficult than usual to hear across the band. We did one piece that was mostly woodwind choir, and I just locked in on Damien and didn't worry about what I could/could not hear -- by the time any sound got back to me it was late anyway.... Teardown and loadout took longer than usual - there was more percussion than we usually haul to summer gigs, and they actually rented a trailer for the stand racks. By the time we got back to Harrison for loadout, we were down to a handful of people. I got to show J how to get Al into his cabinet (Al is the big bass drum that the FCB bought a few years ago, and he lives in a locked cabinet where he can't be damaged by careless high school drummers).